Sunday, September 25, 2011

Tiling continues...

Now the wall tiling (ensuite and bath room) has been done and tiler now laying the floor tiles. It looks pretty good but very hard to capture it with the camera :). I think they had to use some sort of a grinder to level the floor. All the windows, cabinets are covered with white dust due to this grinding.

Ensuite

Around the kitchen

3 comments:

  1. Floor tiles are looking nice Yam....Are they 300x600 ?

    ReplyDelete
  2. Hey A and A, Yeah they are 300x600. I like them :) and the tiler is also pretty cool. It looks like he is doing a pretty good job.

    ReplyDelete