We had our handover on last 17th. It was bit stressful at the end and I expected they couldn't finish all the works timely. Some of the plumbing works were carried out next day after the handover and letter of undertaking was issued for three items and I am still waiting for them to come back. Today is the deadline. Supervisor repaired the damaged garage door instead of replacing it. He promised to replace it and it was even clearly written on the PCI list. So basically it quality assurance wasn't up to the standard I expected. Luckily, we were able to report most of the defects and most of them are now rectified.



Keys


Hmm. Pergola still needs some painting.


Kitchen is cool.





Have to redo the feature tiling (strip is not centered)

4 comments:

  1. Gorgeous Yam. Congratulations on the addition to your keyring. May you and Mrs Yam live happily ever after in your beautiful new home :)

    ReplyDelete
  2. Reinsey beat me to the gorgeous!!
    Love the 'green' splashback and nifty lights over the bench. Facade came up a treat.

    Keep on to them re defects.

    Congratulations and many years of happiness.

    ReplyDelete
  3. Congratulations.... kitchen looks awesome!

    ReplyDelete